Authorized access only. Please sign in to view the demonstrator.
OMMATIXTWINDigital Twin Platform
Nkuku Field Digital Twin
Field-specific concept twin for the Nkuku and Ikong fields. Source records are kept apart from interpretation, assumption and simulation. Nothing here is a live feed.
WORKSPACE
DATA MODE
ALTITUDE
Nothing selected
OVERLAYSLABELS
Operational timeline
HISTORICAL
SIMULATION
FORECAST
No forecast populated. Needs a validated reservoir and production model.
Historical items come from the company website and carry their verification status. Simulation events are generated by the twin. Tap any item.
Engineering workspaces
Management dashboard, Nkuku field
Built for phones, tablets and desktops in any modern browser, including Safari on iPhone and iPad. Every value is simulated until live systems are connected.
OmmatixTwin Platform
Safety compliance, operations watch, methane, LACT measurement, pipeline, inventory, IoT and carbon credits. Every live value is simulated until site systems are connected.
Kill switch
Two switches. Every use is written to the audit log.
Emergency stop request
Trips ESD 1 and stops the drilling simulation. In a live deployment this sends a request to the certified, SIL rated safety system through its approved interface. It never drives equipment directly.
App and agent lockout
Freezes all 30 agents, automation and data feeds, and locks this app until an administrator unlocks it. The plant keeps running under its own control and safety systems.
Audit log
Kept in this browser. A field deployment writes it to the operator's audit trail.
App and agents locked
Version history this twin
Next upgrades
Path to first oil reservoir to cargo tank . live
Tap a block to open its camera and details. A gold outline marks an OmmatixTwin service line.
Production history twin historian . live
Hover or tap the chart to read a sample.
Table view, hourly samples
Twin time
Oil bopd
Water bwpd
Gas MMscf/d
BS and W per cent
Well
Each sample is 10 minutes of twin time and one is taken every second, so a full 24 hours fills in under two and a half minutes. History before the page opened is backfilled from the twin model at the starting choke, assumed. All values are simulated.
Predictive health remaining useful life
Development roadmap
Phase 1, conductor support platformFabricated by CMES, installed by VMI and CMES
REPORTED
Phase 2, extended well test to FSOTest spread, produced water package, flowline, spread moored FSO
CONCEPT
Phase 3, FPSOFull field process and export tied back to the CSP
CONCEPT
Phase sequence from the earlier CMES and VMI announcement used in twin v1 (S24). It is not confirmed by the company website reviewed on 20 Oct 2026, which describes a phased plan led by appraisal drilling (S19). No FSO, FPSO, EPF, platform or pipeline has been selected in any supplied document. Layouts are concept placements, not to scale.